Skip to main content
Rapp AG

Main navigation

  • Range of services
    • To Overview
    • General Planning & Construction Management
      • Construction Management
      • General Planning
    • Operations & Logistics
      • Site development and potential analysis
      • Works and logistics planning
      • Operations and logistics optimisation
      • Transport management
      • Lift planning and optimisation
    • Architecture & Site Planning
      • Project Development
      • Architecture
      • Site traffic and parking
    • Infrastructure & Environment
      • CAD and GIS site documentation
      • Surveying
      • Plant Pipelines, Pipeline Construction
      • Water & Wastewater
      • Deconstruction and remediation
      • Environment
      • General & Industrial Civil Engineering
      • Bridges & Engineering Structures
      • Traffic and Transport Systems
    • Supporting Structures & Specialists
      • Support Structures
      • Construction Logistics
      • Building Physics and Acoustics
      • Fire Protection
      • Safety and Security
      • Building Simulation
      • Relocation Management
    • Mobility & Transport
      • Mobility Services and New Mobility
      • Traffic Planning
      • Telematics for Traffic and Transport
      • Consultancy on public transport
      • Freight transport consulting and planning
      • Mobility and noise protection South Germany
    • Energy Management
      • Private consumption community (ZEV)
      • Consumption data management
      • Energy and water measuring systems
    • Energy Systems
      • Energy concepts
      • Photovoltaics and eMobility
      • Energy and resource efficiency
    • Integral Services
      • Sustainable Planning & Construction
      • Virtual Design and Construction (VDC)
  • References
  • Stories
  • Who we are
    • To Overview
    • Management
    • Team
    • Key Figures
    • History
    • Our commitment
      • Sustainability Strategy
      • Soziales Engagement
      • Promoting the next generation
      • Partnerships
      • Development cooperation
    • Locations and contact
    • Porträt 2025
  • Careers

Meta Navigation

  • Jobs
  • News
  • DE
  • EN
  • FR
  • IT
  • Ausbauprojekt CSL Behring in Bern

    CSL Behring baut in Bern ihre Produktionskapazitäten aus. Wir planen und betreiben die Baulogistik für dieses komplexe Bauvorhaben und sind mit der Logistikplanung beauftragt.

    CSL Behring AG Bern

Breadcrumb

  1. Home
  2. Range of services
  3. Supporting Structures & Specialists
  4. Construction Logistics

Construction Logistics

To build where buildings already exist. Constructing a new building or a conversion in the heart of the city or on an existing company plot is a challenging undertaking. Making these construction sites accessible sometimes calls for extraordinary feats. We have the long-standing experience to help you coordinate your construction logistics.

Alongside site installations, including crane and construction hoist locations, we also plan construction site access and exit routes, personnel access points and accommodation for construction workers.

We find efficient solutions for ensuring compliance with health and safety at work, including alarm notification and rescue measures, and facilitate the control of material supply and disposal during the construction phase.

We develop our planned activities for each construction phase all the way to commissioning based on the current situation and present these in drawings and 3D models.

Services

  • Baustellenpersonal

  • Baubewilligungsthemen

  • Baulogistikplanung

  • Management Baustellenzufahrten

  • Warenfluss auf der Baustelle

Downloads

    Baulogistik

    Die Baustelle im Griff

    1.99 MB

Contact us:

  • ri-brändlin-daniel-1

    Daniel Brändlin

    Co-Team Leader Construction Logistics

    Co-Management BIM/VDC

    Contact Information
    • Email
    • +41 58 595 78 41
  • ri-vollenweider-reto-2.jpg

    Reto Vollenweider

    Co-Team Leader Construction Logistics 

    Co-Management BIM/VDC

    Contact Information
    • Email
    • +41 58 595 79 53

References

Show All
  • E+H Neubau Kompetenzzentrum1

    New industrial building for Endress+Hauser Flow

    • Client

      Endress+Hauser Flow Switzerland

    • Segment

      Machine and apparatus construction

    • Location

      Reinach (BL)

  • ra-Uni-NB-Zahnmed-Basel-gal_03

    A new home for the Basel dental clinics

    • Client

      Universität Basel / Bau- und Verkehrsdepartement Kanton Basel-Stadt

    • Segment

      Healthcare sector, Schools

    • Location

      Basel

Questions and answers about construction logistics

What specific services does Rapp offer in the area of construction logistics?

Rapp has many years of experience in construction logistics. The following services are among our most important in this area:

  • We carry out construction logistics planning, which includes planning the construction phases and setting up the construction site. Concrete logistics is also part of construction logistics planning – as is lean construction. This means that processes are designed to be as efficient as possible.
  • The organisation of construction site personnel also falls within the scope of construction logistics. This includes, for example, accommodation for construction workers, the provision of sanitary facilities and access control to the construction site.
  • We are also responsible for the flow of goods and for supply and disposal. We procure construction lifts, plan storage areas and create concepts for the utilisation of cranes.
  • Construction site traffic management is another field in construction logistics planning. Among other things, this involves determining access routes and transshipment centres. The use of online notification systems facilitates the coordination of construction site traffic.
  • On request, we can also provide specialist construction management. As part of this, we coordinate the supply of materials and warehouse management and are responsible for operational management.
  • Occupational health and safety are important aspects of construction logistics. We analyse the potential dangers and draw up emergency concepts. We also conduct safety inspections and training courses to minimise the risks.

The coordination of several construction projects and the joint utilisation of installations are among the tasks of higher-level construction logistics.

 

Why is construction logistics so important, especially for inner-city or operating companies?

The construction logistics carried out by Rapp play an important role, especially for inner-city construction projects and for construction projects in operating companies. There are various reasons for this.

  • Construction logistics increase the efficiency of construction measures. This is achieved primarily through the targeted planning, management and control of material flows. The coordination of the personnel involved also helps to increase efficiency.
  • Optimised processes in construction projects lead to cost and time savings. This applies in particular to urban and commercial environments.
  • Construction logistics ensure the smooth supply of building materials as well as coordinating their distribution in the construction process.

There is comparatively little space available for construction work in urban areas. Storage and access routes must therefore be carefully planned. One practical solution is just-in-time material delivery. Materials are delivered exactly when they are needed. This significantly reduces the storage space required. In addition, the available space is utilised efficiently.

In the case of inner-city construction projects, it is essential to take traffic and the local residents into consideration. If the delivery of materials is uncoordinated, this has negative consequences for many people. There may be disruptions in road traffic and local public transport. In addition, the noise and air pollution caused by uncoordinated material deliveries affect the quality of life of neighbouring residents.

Optimising the positioning of unloading points reduces noise and emissions and avoids traffic peaks. The same can be achieved if lorry traffic to and from the construction site is bundled.

Sometimes construction projects must be realised while factories, offices or clinics are in operation. At the same time, it must be ensured that supply, security and accessibility are maintained. Depending on the environment in which the construction project takes place, employees and/or customers should not be affected. With suitable measures, the construction work can be carried out smoothly without disrupting operational processes.

Demanding construction projects are usually characterised by tight deadlines. Construction logistics planning ensures that all trades work towards deadlines and can react flexibly to changes.

Thanks to construction logistics, comprehensive process planning takes place, covering everything from preparation to commissioning. All measures focus on quality, occupational safety and adherence to the schedule.

 

Which project phases does Rapp support with construction logistics? 

Rapp provides support in all phases of construction projects.

  • For example, in the early planning phase, we assess requirements and draw up construction schedules.
  • During the preparation phase, we design the construction site logistics and site installation. We also plan safety measures and rescue concepts and instruct all persons involved in the project.
  • During the realisation phase, we manage supply and disposal and coordinate the supply of materials and warehouse management. We are also responsible for the management of construction site traffic and personnel.
  • One of the most important tasks in the operational and finalisation phase is the coordination of health and safety. This includes carrying out safety inspections and establishing access control systems and rules of conduct for employees.

 

For which construction projects is construction logistics particularly suitable?

Construction logistics is relevant for virtually every construction project. They are of particular importance for complex construction projects and those that are restricted in their realisation. These construction projects benefit above all from construction logistics:

  • Inner-city projects
  • Large construction sites with numerous companies involved and a high demand for materials
  • Construction projects in operating companies
  • Projects involving infrastructural elements such as bridges, tunnels, roads or railway lines
  • Refurbishments, renovations and extensions carried out in existing buildings or densely built-up neighbourhoods
  • Sustainable and innovative construction projects, for example in modular construction

Related area of activity

  • Architecture

    We relish being presented with demanding architectural challenges.

    Read more
  • Construction Management

    We ensure the smooth collaboration of all parties involved in your project.

    Read more
  • Environment

    Our experience ensures that environmental concerns are always taken into account in accordance with statutory regulations and ecological requirements.

    Read more
  • General Planning

    We plan and coordinate every aspect of your construction project.

    Read more
  • Safety and Security

    Optimum protection – we ensure that the safety of people and the environment is guaranteed even in the event of an incident.

    Read more
  • Site traffic and parking

    Changing requirements and unutilised commercial potential motivate owners to convert and develop plots. Data that is up to date and free of redundancies is essential both in this regard and for planning purposes – you can count on us as experienced consulting and planning partners.

    Read more
  • Traffic Planning

    Designing sustainable, economic, efficient and safe traffic systems for the future is a comprehensive responsibility for traffic planning that we are happy to take on.

    Read more

Contact us:

+41 58 595 77 77 info@rapp.ch

Social Links

Rapp AG

Hochstrasse 100
Postfach
4018 Basel
Switzerland

Downloads

Zur Übersicht
  • Organigram Rapp Ltd
  • Internship at Rapp
  • VHKA Sample Invoice Consumption Share
  • VHKA Sample Invoice Per Franc

Footer

  • Legal notice
  • Data Protection Declaration
  • Cookie-Einstellungen
  • © 2025 Rapp AG Basel
Rapp AG
  • Range of services
    • To Overview
    • General Planning & Construction Management
    • Operations & Logistics
    • Architecture & Site Planning
    • Infrastructure & Environment
    • Supporting Structures & Specialists
      • To Overview
      • Support Structures
      • Construction Logistics
      • Building Physics and Acoustics
      • Fire Protection
      • Safety and Security
      • Building Simulation
      • Relocation Management
    • Mobility & Transport
    • Energy Management
    • Energy Systems
    • Integral Services
  • References
  • Stories
  • Who we are
  • Careers

Meta Navigation

  • Jobs
  • News
  • DE
  • EN
  • FR
  • IT